
Midstream infrastructure, fabricated to flow integrity standards.
Complete pipeline systems — from line-pipe and bends to pig launchers, receivers, compressor stations and metering — engineered for long-life pipeline integrity.
Cross-country systems up to 36'' diameter.
Pipeline Construction
Cross-country pipeline construction up to 36'' diameter — onshore oil, gas, fuel and water lines.
Pig Launchers & Receivers
Standard and custom launching/receiving systems, pre-assembled, valved and tested.
Compressor Stations
Gas compressor stations, electrocompressor units and prime-mover packages.
Metering & Pump Stations
Custody-transfer metering, prover loops, condensate metering and multi-product pumping stations.
Manifolds & Above-Ground Piping
Production, injection and distribution manifolds. AGI piping with insulation and tracing.
Coating & Hydrotest
Pipeline external/internal coating, hydrostatic testing, dewatering and drying.
Why pigging matters.
Extend pipeline life
Regular pigging removes deposits and prevents internal corrosion.
Improve flow & efficiency
Higher 'C' values, lower pumping cost, increased throughput.
Recover usable product
Displace product before maintenance and product changeovers.
Inspection-ready
Cleaning runs prepare pipelines for ILI / smart-pig inspection.
